SL.No. | Name of CETP | Capacity | Nature of Services Offered |
---|---|---|---|
1 | M/s. Angeripalayam Common Effluent Treatment Plant Co. Ltd., Tirpur – 3 | 8000 KLD | Consultancy and Supply of moving mechanisms erection of entire Electro Mechanical Works and Commissioning of CETP Laying of Collection and Conveying system (HDPE pipes supplied by the Client) |
2 | M/s. Karur Vanchi Dyeing Envirotech Ltd. Vangal Road. Karur. | 1150 KLD | Consultancy, Civil, Supply, Erection Testing & commissioning of all Electro Mechanical Equipements and Commissioning of CEPT Supply and laying of Conveying system including one number of collection well cum pumping station. |
3 | M/s. Karur Andan Koil Pollution Control Ltd. Andan Koil, Karur. | 1250 KLD | Laying of Conveying system including one number of collection well cum pumping station. |
4 | M/s. Karur Taluk Dyeing Enviro Ltd, Karur. | 1350 KLD | Construction of Pumping station and Pipeline works |
5 | M/s. Karur Sellandipalayam Pollution Control Limited , Karur. | 1. Supply of Sand Filters 180m32 Nos. 2. Construction of Pumping Station. |
|
6 | M/s. Kovai Telungupalayam CETP Pvt. Ltd., No. 72C, Bharathi Road, Telunguoalayam, Coimbatore – 39 | 4000 KLD | Construction of CETP and laying of Collection and Cinveying system (Hdpe pipes supplied by the Client) on turn Key Basis nearing completion. |
7 | M/s. Karur sukkaliyar CETP Company Ltd., Sukkaliyur (PO), Karur – 3 | Construction of Clarfiflocculation Tank and supply of Clarifiers 2 Nos. and other mechanical equipments. | |
8 | 65 Numbers of RO/Nano Filtration Plants at Karur | 50 m3/day to 500m3/day | Design, Supply, Erection & Commissioning of RO/Nano Filtration Plant |
SL.No. | Name and Address of the companyName of CETP | Capacity | Type of Industry | Nature of work | Project Cost |
---|---|---|---|---|---|
9 | Kerala Industrial Infrastructure Development corporation (Kerala State Govt. Corporation) Trivandrum | 400m3/day | Sewage / Effluent Treatment Plant for food Processing units. | Design, construction and commissioning of CETP and conveying system on Turnkey basis | Rs.92.00 Lakhs |
10 | ST-CMS Electric Company 250mw LFPP power project (ALSTOM Group) Uthangal, Virudhachalam | 30m3/day | Sewage Treatment Plant for Employees/workers in power project | Design, Construction and Commissioning of Sewage Treatment Plant and conveying pipeline work on turnkey basis. | Rs.37.00 Lakhs |
11 | More than 100 numbers of RO Plant for Bleaching & Dyeing Units at Tiruppur | 50m3/day to 200 m3/day | Bleaching & Dyeing unit | Design, Supply, Erection & Commissioning of RO Plant | Rs.250 Lakhs |
12 | M/s. Midas Golden Distilleries Pvt. Ltd., 2/207, Padappai Pusphagiri Rd, Padappai | 200 m3/day | Distillery Effluent | Design, Supply, Erection & Commissioning of ETP & RO Plant | Rs.87 Lakhs |
13 | KovaiTelungupalayam CETP (P) Ltd., 72-C, Bharathi Road, Telungupalayam, Coimbatore. | 4000m3/day | Common Effluent Treatment plant for Dyeing and Bleaching Units. | Design, construction and commissioning of CETP and conveying system on turnkey basis | Rs.4.60 Crores |
14 | M/s. EID Parry (India) Ltd., Parry Nutraceuticals Division, Kadiapatti-Nemathanpatti Road, Oonaiyur Village, Panangudi (PO), Pudukkotai Dist – 622 505 | 220 m3/day | Algae Effluent | Design, Supply, Erection & Commissioning of ETP, RO & Evaporator | Rs.270 lakhs |
15 | M/s. Larsen & Toubro Ltd. Earth moving machine Services 2/614,post Box No:29, Arcot Road, Mugalivakkam,Porur, Chennai-600 016 | 30 m3/day | Sewage | Design, Supply, Civil Construction, Erection and Commissioning | Rs. 25 Lakhs |
16 | M/s. Rane Engine Valves Ltd, Plant 5(Trichy Plant) Survey No: 110-111, Seniapathi, Viralimalai Union, Pudukottai Dist | 30 m3/day | Sewage | Design, Supply, Erection and Commissioning | Rs. 12 Lakhs |
SL.No. | Name of work | Name of client | Remarks |
---|---|---|---|
1 | Construction of Polytechnic college building in 4 floors, of 15000 SQFT in each floor | Devangar Polytechnic College D.Vadipatti, Periyakualam Theni District. | Completed on Sep 2014 |
2 | Construction of 146 Nos. residential flats, (stilt + 9 floors), in 2 blocks at Vanagaram | Guru Ragavendra Foundation 50, BB Road Perambur Chennai – 600 011 | Completed on Feb 2015 |
3 | Construction of sewage treatment plant of capacity 3 MLD at Thirumazhisai Town Panchayath | Chennai Metropolitan Water Supply and Sewerage Board, Chennai | Completed on Sep 2014 |
SL.No. | Name of work | Name of client | Project Cost |
---|---|---|---|
1 | Revamping / improvement work in the existing ETP 1, ETP 2, UF 1, UF 2, RO 1, RO 2, RO 3, MEE and ATFD | M/s. EID Parry (India) Ltd., Parry Nutraceuticals Division, Kadiapatti-Nemathanpatti Road, Oonaiyur Village, Panangudi (PO), Pudukkotai Dist – 622 505 | Rs. 207 Lakhs |
2 | Installation of Additional RO system | M/s. Vettuvapalayam CET & Recycling Plant (P) Ltd. SF No. 40, Sambavayal Thottam, Vettuvapalayam, Mangalam, Tirupur – 641 663 | Rs. 101 Lakhs |